A dedicated 240-volt circuit and a properly installed Level 2 charger means a full charge overnight instead of a slow trickle from a wall outlet. We handle the load calculation, the circuit, and the charger install, with same-day estimates and 24-hour emergency service if something goes wrong.
Both charge your EV well. The right choice depends on how you'll use it and whether you'll keep the charger if you move.
A Level 2 charger needs a dedicated 40 to 60-amp circuit, and your panel needs spare capacity to safely support it. This is the single biggest factor in EV charger installation cost, and it's property-specific, not something we can quote sight unseen.
Many homes don't need a panel upgrade at all. We won't sell you one you don't need.
Assumes a panel with available capacity. A panel upgrade, if needed, is priced separately.
Includes the dedicated circuit and required GFCI breaker.
Wired directly into the panel, unlocking up to 48-amp charging.
Only required when the load calculation shows insufficient capacity.
A NEMA 14-50 outlet for a plug-in charger typically runs $300 to $900. A hardwired charger runs $400 to $1,500. If your panel needs an upgrade to support the new circuit, that adds $1,500 to $4,000 on top.
A plug-in NEMA 14-50 setup is often slightly cheaper and portable if you move. A hardwired charger unlocks faster 48-amp charging and skips the GFCI breaker requirement, making it the cleaner choice if you're staying long-term.
We can't say for certain without a load calculation, which we do during your estimate. Many homes on 200-amp service have room. Some don't, and a load-management device can sometimes avoid a full panel upgrade.
Yes, almost every jurisdiction requires a permit for a new 240-volt circuit. We handle the permit application and schedule the required inspection as part of the job.
Yes, with the right weatherproof rated equipment and, in many areas, a hardwired connection rather than a plug-in outlet. We'll spec the right setup for an outdoor location.
A straightforward install with the panel nearby and available capacity typically takes 2 to 4 hours. If a panel upgrade is also needed, plan for that as a separate, longer job.
We'll check your panel capacity and give you a straight answer on cost, no guesswork. Prefer to reach out online? Visit our contact page.
Serving Lithia and nearby FishHawk, Riverview, and Valrico. See our full service area list or learn more about our team.